Change Property
Back Button

Property
Development

Singapore

8 Shenton Way (Redevelopment)

8 Shenton Way will be Singapore’s tallest building towering 305 metres and among Asia’s most sustainable skyscrapers. It will also be Singapore’s first supertall building, defined as a structure above 300 metres. Designed by American architecture firm Skidmore, Owings & Merrill (SOM), together with Singapore architecture firm DCA Architects, is slated for completion in 2028.

8 Shenton Way will connect to Singapore’s subterranean pedestrian network, including direct underground connectivity to the Tanjong Pagar Mass Rapid Transit (“MRT”) station, as well as three additional MRT stations within a five-minute walk: the Shenton Way MRT Station and Maxwell MRT Station, and the Prince Edward Road MRT Station, which will close the loop between Harbourfront and Marina Bay MRT stations on the Circle Line in 2026.

Type Mixed-use integrated development
Location Tanjong Pagar, Singapore
Stake 6.09%
Tenure Leasehold - 99 years, expiring on 18 July 20811
Number of Floors TBC
Expected Completion 2028
Gross Floor Area (sq ft) 1,597,905
Land Area (sq ft) 118,229

1. Pending top-up to 99 years

8 Shenton Way
8 Shenton Way

All Rights Reserved © SingHaiyi Group Pte Ltd

x SingHaiyi